- Home
- Projects
- Baldwin Dam
Baldwin Dam conversion
Douglas County, Colorado
Project description
The Baldwin Dam Conversion turned a high hazard dam into a non jurisdictional structure by reshaping the flood attenuation pool area and building a lower, more stable earthen emergency spillway.
- 185,000 CY of embankment
- 29,040 CY of topsoil distribution
- 39 acres of erosion control and seeding
- 4,561 LF of vinyl and iron fencing

